How to erect the crane reasonably and correctly
2021-03-31 14:19:57
As the main equipment for handling and lifting heavy objects in various places, cranes are widely used, which bring a lot of convenience for construction. But before use, it needs to be erected first, so how to erect the crane reasonably and correctly? Next, Xiaobian will take you to have a detailed understanding.
1. Set the mast in the middle of the main beam of the crane, and slightly close to the side of the heavier main beam, so that the lifting equipment will not tilt, and tie the electric hoist firmly on the main beam and lift at the same time.
2. When lifting, it should keep stable rising, and can't swing at will. In order to make people control it, the rope can be tied on both ends of the equipment.
3. Use the hoist and mast to put the rope into the hoisting hole for hoisting.
4. Lift the equipment to a proper height, fix the control room on the connecting frame and the connecting base with bolts, and then weld the connecting base on the main beam and the cross beam according to the attached drawings.
5. When the equipment is hoisted beyond the track, pull the rope to twist, and gradually fall, so that the wheel groove of the crane can be aligned with the track and slowly fall down.